main photo of Door, Main Entry and Frame - Kit - L1
Scan w/camera phone

Door, Main Entry and Frame - Kit - L1

Contact for pricing


Forward Passenger Entry Door - "Kit" L1: Floor, frame and practical door. Included: Bull horn, 2 flashlights and 1 PA / Intercom. Set up time: Allow 3.5 days to assemble. Strike time: Allow 1.5 days to disassemble. Handling & Location requirements: Landing site: 16.5″ High deck needs to be built around floor height of door and frame. Crew: Forklift driver and two (2) Grip / Carpenters. Equipment: Forklift, Straps, and dollies.

SKU 14-16

Size 4' w × 8'5" h × 9'3" d

Quantity 1

Condition Good

Weight 2500 lb

Located at LA

Questions? Call (888) 662-5877

Discover more great items like this on aeromockups.com