
Scan w/camera phone
Door, Main Entry and Frame - Kit - L1
Contact for pricing
Forward Passenger Entry Door - "Kit" L1: Floor, frame and practical door.
Included: Bull horn, 2 flashlights and 1 PA / Intercom.
Set up time: Allow 3.5 days to assemble.
Strike time: Allow 1.5 days to disassemble.
Handling & Location requirements:
Landing site: 16.5″ High deck needs to be built around floor height of door and frame.
Crew: Forklift driver and two (2) Grip / Carpenters.
Equipment: Forklift, Straps, and dollies.
SKU 14-16
Size 4' w × 8'5" h × 9'3" d
Quantity 1
Condition Good
Weight 2500 lb
Located at LA
Questions? Call (888) 662-5877
Discover more great items like this on aeromockups.com