
Scan w/camera phone
Door, Service and Frame - Kit - R1
Contact for pricing
Forward Service Entry Door – “Kit” R1: Floor, frame and practical door.
Set up time: Allow 3.5 days to assemble.
Strike time: Allow 1.5 days to disassemble.
Handling & Location requirements:
Landing site: 16.5″ High deck needs to be built around floor height of door and frame.
Crew: Forklift driver and two (2) Grip / Carpenters.
Equipment: Forklift, Straps, and dollies.
SKU 14-17
Size 4' w × 8'5" h × 9'3" d
Quantity 1
Condition Good
Weight 2500 lb
Located at LA
Questions? Call (888) 662-5877
Discover more great items like this on aeromockups.com